Offerings

Legacy assessment

A sound basis for deciding what to do with a system that slows you down.

Duration
3 to 4 weeks

What you get

  • Survey of architecture, technology currency and dependencies
  • Assessment of the risks in day-to-day operation
  • Comparison of the options: keep running, replace step by step, rebuild
  • Written report with a recommendation and an effort range

A good fit if

  • A grown system causes high maintenance cost or blocks new requirements.
  • You need to justify a replacement decision internally.
  • The original engineering team is no longer available.

Not a fit if

  • Greenfield work with no existing system.
  • Plain code reviews of individual components.

Not sure which one fits?

That is the normal case. In an initial conversation we work out which entry point suits your situation — or whether none of them does.

Get in touch